Gold Member Since 2011
Audited Supplier
Nanjing Jusha Display Technology Co., Ltd.

Medical Strip, Wash Monitoring Indicator, Cssd Bowie manufacturer / supplier in China, offering Class 4 Chemical Indicator, Cssd Equipment, Sterilization and Disinfection, Chemical Indicator, 10MP 30-Inch 4096X2600 LCD Screen Monochrome Monitor, CE Approved, Open MRI, (JUSHA-C42) 4m LED Color High Resolution Display, LCD Monitor, Medical Monitor and so on.

(/ )

Supplier Homepage Product Class 4 Chemical Indicator Class 4 Chemical Indicator, Cssd Equipment, Sterilization and Disinfection, Chemical Indicator

Class 4 Chemical Indicator, Cssd Equipment, Sterilization and Disinfection, Chemical Indicator

FOB Price: US $1-99,999 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1-99,999/ Piece
Get Latest Price
Transport Package: 500PCS/Box
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: 9001
  • Certification: CE, SGS
  • Group: Adult
  • Pack: 500PCS/Box
  • Feature: Disposable
  • Disinfection: Disinfection
  • Specification: CE SGS
  • Type: Surgical Tape
  • Ethylene Oxide Sterilization: Without Ethylene Oxide Sterilization
  • Size: 20*2cm
  • Capacity: 500000PCS/Year
  • Function: Waterproof
  • Trademark: JUSHA or OEM
  • Origin: China
Product Description
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
1.Detect air residual from entire load;
2.Steady color change,easy to read;
3.Lead free formulation.
Test cycle of the resistometer
a)Evacuate the resistometer to 4.5±0.5KPa within 2minutes.
b)Admit steam to the resistometer to obtain the required temperature in 10s or less.
c)Maintain the conditions for the required exposure time.
d)At the end of the exposure period ,evacuate the resistometer to 10KPa or less within 1 min,then admit air to ambient pressure.
Send your message to this supplier
Avatar
Ms. Ivy
Sales
*From:
To: Ms. Ivy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now